Shore-to-ship power that lets vessels shut down at berth without slowing cargo.

Why · How · What

Shore-to-Ship Power in three lines

Why — It matters

A port's air belongs to the city beside it.

How — We approach it

Zero emissions at berth, cargo uninterrupted, green source to quay to ship, metered per call, and containerised station: frequency converters, battery storage, HV ring in ducts and flush outlet pits

What — We deliver

A containerised, modular shore power system engineered around your port, to IEC/IEEE 80005 and IEC 62613, delivered at zero capex on BOOT.

Ports must cut the exhaust, noise and vibration produced by ships at berth, without slowing cargo operations. Cutting emissions where they affect people most also strengthens the local grid, makes the port a power utility and prepares it for tightening green-port requirements.

What it is

Connecting the ship to the grid

A ship alongside still needs power for cargo handling, reefers, pumps and hotel load. It usually makes that power by running diesel auxiliary engines next to the city, often for a day or more. In a single large container-ship call that can mean about 33 MWh of electricity, 7.3 tonnes of marine gas oil and 23 tonnes of CO₂ at the quay, plus NOx, SOx, particulates and noise (indicative: about 1.4 MW average hotel load over a 24-hour call). Shore-to-ship power, also called onshore power supply or cold ironing, connects the vessel to the grid instead. Aatash designs each system around four inputs: the vessels' needs (440 V, 6.6 kV or 11 kV; 50 or 60 Hz), the port's infrastructure and priorities, the regulations (IEC/IEEE 80005, IEC 62613, MARPOL Annex VI and national rules) and the best proven global technology. Its preferred model is BOOT: Aatash finances, builds, owns and operates the system at zero capex for the port, shares the revenue and transfers the asset at the end of the term. The connection, from grid to ship: substation, frequency converter, berth connection, shore switchboard.

Connecting the ship to the grid

How it works

Connect, convert, supply, meter

01

Green source

Port grid plus solar, brought in on a 33 kV feeder.

02

Containerised shore power station

Frequency converters turn 50 Hz into the 60 Hz most ships need; isolation transformers deliver 6.6 or 11 kV.

03

Battery storage

An LFP battery shaves peaks and keeps the supply free of transients and harmonics.

04

HV ring in ducts

Runs beneath the crane rails. Nothing is laid across the quay.

05

Flush outlet pits

IEC 62613 sockets about every 70 m along the berth.

06

Ship plugs in

The ship's own reel lowers the cable, the load transfers and the gensets switch off. Energy is metered and CO₂ savings certified per call.

What it does for you

Cleaner, quieter berths

Cuts emissions at berth: CO₂, SOx, NOx and particulates, where they affect people most.

Reduces noise and vibration for crews, port workers and neighbouring communities.

Makes the port a power utility: a long-term revenue stream with low maintenance.

Strengthens the local grid. Modern frequency converters improve power factor and stability.

Prepares the port for IMO MARPOL Annex VI, India's Harit Sagar green-port guidelines, DGS Circular 09/2025 and shipping lines' net-zero targets.

Scope

What is included

01

Containerised shore power station: 33 kV incoming transformer, static frequency converters (typically 2 × 5 MVA, 50 → 60 Hz), LFP battery storage (typically 2 MW / 4 MWh), isolation transformers delivering 6.6 or 11 kV, and an E-house with SCADA / EMS.

02

Ship side: shore-connection switchboard, cabling to the main switchboard and, where required, a step-down transformer.

03

Quay and control: HV ring in trenchless ducts beneath the crane rails, flush IEC 62613 outlet pits about every 70 m, ship-shore communication, synchronised load transfer, a ≤100 ms safety trip, energy metering, billing and carbon reporting.

04

Engineering to IEC/IEEE 80005-1, -2 and -3 and IEC 62613; MARPOL Annex VI and DGS Circular 09/2025.

Containerised shore power

One system, four ways to reach the ship.

A: fixed outlet pits, flush sockets along the berth for the cleanest quay. B: a quay-side Aatash Shore Power Container, a 20 ft ISO unit with HV switchgear, transformer and cable reel, handled like any box. C: an on-deck container that the quay crane lifts into a deck slot, for narrow aprons. D: a hybrid of pits and containers to cover every berth. Smaller vessels use a mobile LV skid (6.6 kV / 440 V, to IEC/IEEE 80005-3).

One system, four ways to reach the ship.

Project readiness

From port study to detailed project report.

Aatash has prepared detailed project reports for shore-to-ship power at some of the key ports in India, using its specialised in-house engineering team.

Each study starts with the vessels a berth receives and the power they draw. It ends with a connection that is sized, costed and ready to build.

Key Highlights

DPR — detailed project reports prepared for key Indian ports
In-house — specialised shore-power engineering team
BOOT — zero capex for the port: Aatash finances, builds, owns, operates and transfers
From port study to detailed project report.

Sizing

Sized to the vessel

Ro/Ro ferry

under 11 kV · 50 and 60 Hz

up to 6.5 MVA

Container ship

6.6 kV · 60 Hz

up to 7.5 MVA

Cruise ship

6.6 and 11 kV · 60 Hz

16 to 20 MVA

LNG carrier / tanker

6.6 kV · 60 Hz

up to 10 MVA

Shipyards and naval berths

under 11 kV · 50 and 60 Hz

case by case

Markets

Where it is used

Plan your berth

Shore-to-Ship Power

Plan a shore-power connection