Power that keeps its promise for decades.
Solar plants engineered for lifetime yield, by a company that owns and runs one.
Why · How · What
The transition is won by plants that perform, not plants that are announced.
Promised yield, delivered for twenty-five years, one contractor from site survey to grid synchronisation and O&M, and PV modules, inverters, structures and a grid substation
Solar EPC, turnkey delivery, operation and maintenance, and BOOT/RESCO supply. Shore power for ports.
What you gain
Lowers the cost of energy and protects against tariff increases.
Delivers measurable emissions reduction for reporting and compliance.
Removes interface risk: one contractor for design, supply, construction and approvals.
Protects yield through monitoring and preventive maintenance.
Energy costs are rising, emissions targets are tightening and grid supply cannot always be relied on. Whether to move to solar is no longer the question. Getting a plant that delivers its promised yield for twenty-five years is.
Scope
01
On-grid and off-grid plants for residential, commercial, institutional, industrial and utility customers.
02
Eight steps, from the customer's need assessment and site survey to operation and maintenance.
03
For new and existing plants, with remote monitoring.
04
Aatash invests, builds and operates; the customer buys the power.
05
Net-metering and statutory approvals.
Aatash Power builds what it also owns. It financed, designed, built and commissioned its own photovoltaic plant at Dhansura in 2012 and has operated it with its own engineers since. The same team built the 66 kV substation that evacuates the power.
Project
In 2012, Aatash Power Pvt. Ltd. (APPL) entered the renewable energy sector by commissioning a 5 MW DC poly-crystalline solar plant at Dhansura, Gujarat. APPL's in-house team handled everything from financing and design to construction and operations.

All-Time
Power Generation
Last updated: 15:24 IST
Today's
Power Generation
Last updated: 15:24 IST
Energy Priorities
Energy is among the largest controllable costs of any industrial site.
Customers, lenders and regulators now ask for evidence of decarbonisation.
A poorly engineered plant under-delivers for its whole life.
Ships account for most of a port's greenhouse-gas emissions.